📋 Construction Planning & Management Notes
Project planning, CPM/PERT, crashing, resources, equipment, contracts, quality, safety and engineering economics.
20 of 20 chapters written
Chapters
- 01Construction Planning & Project ManagementConstruction projects and their characteristics; project life cycle and stages (conception, feasibility, DPR, design, procurement, construction, commissioning, closure); objectives of project management — time, cost, quality, scope and safety; functions of management (planning, organising, staffing, directing, controlling); stages of planning — pre-tender and post-tender (contract) planning; work breakdown structure; project organisation structures (functional, projectized, matrix); stakeholders; planning tools overview.Read →
- 02Scheduling & Monitoring — Bar Charts and Milestone ChartsScheduling and its purposes; bar (Gantt) charts — construction, uses, advantages and limitations; linked bar charts; milestone charts; progress monitoring on bar charts; line of balance for repetitive works; S-curves (cumulative progress and cost); types of schedules — construction, labour, material, equipment and financial schedules; updating and look-ahead schedules — with worked examples.Read →
- 03Network Analysis — CPMNetwork terminology — activity, event, dummy, predecessor and successor; activity-on-arrow (AOA) and activity-on-node (AON/precedence) diagrams; rules for drawing networks (Fulkerson's rule for numbering); errors — looping, dangling, redundancy; forward and backward pass; earliest and latest times of events and activities; critical path; floats — total, free, independent and interfering; slack of events; precedence diagram relationships (FS, SS, FF, SF, lags) — with fully worked examples.Read →
- 04PERTProgramme Evaluation and Review Technique — origin and features; three time estimates (optimistic, most likely, pessimistic); beta distribution; expected time, standard deviation and variance of activities; project expected duration and variance along the critical path; normal distribution and probability of completion by a scheduled date; time required for a given probability; slack and critical path; comparison of PERT and CPM — with fully worked numericals.Read →
- 05Project Crashing — Time-Cost Trade-offDirect and indirect project costs; normal time and cost, crash time and cost; cost slope; total cost curve and optimum duration; steps of crashing a network — crashing critical activities in order of cost slope, parallel critical paths, new critical paths, stopping rules; fast tracking vs crashing; updating networks — with a fully worked crashing problem.Read →
- 06Resource Allocation & Resource LevellingResources in construction — manpower, materials, machinery, money and space; resource planning, aggregation and resource histograms; resource loading; resource levelling (smoothing) within floats without changing duration; resource-constrained scheduling (allocation) when limits are fixed; heuristic priority rules; measures of levelling (peak demand, sum of squares); resource-loaded S-curves and cash flow — with worked examples.Read →
- 07Cost Control & Earned Value ManagementProject cost control — budgeting, cost codes, monitoring and corrective action; causes of cost overrun; earned value management (EVM) — planned value, earned value and actual cost; cost and schedule variances; cost and schedule performance indices; estimate at completion, estimate to complete, variance at completion and to-complete performance index; interpretation of S-curves; cash flow control — with a fully worked earned value problem.Read →
- 08Project Risk ManagementRisk and uncertainty; sources of risk in construction projects — technical, site, financial, contractual, political, environmental, safety and force majeure; risk management process — planning, identification, qualitative analysis (probability–impact matrix), quantitative analysis (expected monetary value, sensitivity, decision trees, Monte Carlo simulation), response planning and monitoring; risk responses for threats and opportunities; risk allocation in contracts, insurance and bonds; risk register — with worked examples.Read →
- 09Engineering EconomicsTime value of money; simple and compound interest; nominal and effective interest rates; cash flow diagrams; interest factors — single payment, uniform series (sinking fund, capital recovery, present worth, compound amount), gradient; comparison of alternatives — present worth, annual worth, future worth, rate of return (IRR), benefit–cost ratio, payback period; break-even analysis; inflation; depreciation and replacement analysis; life cycle cost — with fully worked numericals.Read →
- 10Construction EquipmentClassification and selection of construction equipment; earthmoving equipment — bulldozers, scrapers, motor graders, power shovels, backhoes (hoes), draglines, clamshells, loaders, trenchers; hauling equipment — dumpers, tippers, conveyors; compaction equipment — smooth wheel, sheepsfoot, pneumatic tyred, vibratory rollers, rammers and plate compactors; hoisting equipment — cranes, hoists, derricks; concrete equipment — mixers, batching plants, transit mixers, pumps, vibrators; paving equipment; pile driving, drilling, tunnelling and dewatering equipment.Read →
- 11Productivity & Owning and Operating Cost of EquipmentSoil volume changes — bank, loose and compacted measure, swell, load factor and shrinkage; equipment output — cycle time, bucket fill factor, job efficiency; production of excavators, loaders, dozers and scrapers; matching trucks with loaders; rolling resistance, grade resistance, rimpull, drawbar pull, coefficient of traction and altitude effects; owning costs (depreciation, interest, insurance, taxes, storage) and operating costs (fuel, lubricants, tyres, repairs, operator); cost per hour and per cubic metre; labour productivity — with worked numericals.Read →
- 12Contracts, Tendering & ArbitrationContract essentials under the Indian Contract Act, 1872 — valid, void and voidable contracts; types of construction contracts — lump sum, item rate (unit rate), percentage rate, cost plus (percentage, fixed fee, target cost), labour, turnkey/EPC, design-build; PPP models — BOT, BOOT, BOO, DBFOT, HAM, annuity; FIDIC forms; tendering process — NIT, tender documents, pre-bid meeting, EMD, two-bid system, e-tendering, evaluation (L1, QCBS), negotiation and award; important contract conditions — performance security, advances, price variation, extension of time, liquidated damages, defect liability, variations, termination; claims and dispute resolution — negotiation, mediation, conciliation, dispute boards, arbitration under the Arbitration and Conciliation Act, 1996, litigation.Read →
- 13Quality Control & Quality AssuranceQuality and its dimensions in construction; quality control vs quality assurance vs quality management; quality gurus — Deming (PDCA), Juran (trilogy), Crosby (zero defects), Ishikawa; total quality management; ISO 9001 quality management systems; quality assurance plan and inspection and test plans; seven basic QC tools; statistical quality control — control charts for variables and attributes, process capability, acceptance sampling; cost of quality; Six Sigma; quality control of concrete — target mean strength, sampling frequency and acceptance (IS 456/IS 10262); non-destructive tests — with worked examples.Read →
- 14Construction Safety, Labour Laws & WelfareImportance of construction safety; causes of accidents — unsafe acts and unsafe conditions; accident theories (Heinrich's domino theory and accident pyramid); hierarchy of controls; personal protective equipment; safety in excavation, scaffolding, ladders, working at height, formwork, electrical work, cranes, demolition and fire; safety management — safety policy, safety officer, toolbox talks, audits, permits; accident reporting and frequency and severity rates (IS 3786); relevant Indian standards; labour laws applicable to construction — BOCW Act and Cess Act 1996, Contract Labour Act, Minimum Wages, Employees' Compensation, EPF, ESI and others, and the four Labour Codes; labour welfare facilities — with worked examples.Read →
- 15Site Organisation & SupervisionOrganisation — principles (unity of command, span of control, delegation, scalar chain); types of organisation — line, line and staff, functional (Taylor), committee; Fayol's principles; site organisation of a construction project and duties of site engineers; site layout planning — stores, batching plant, cranes, access roads, temporary facilities; site records and registers — site order book, hindrance register, cement and material registers, daily progress report, test registers; materials and stores management — ABC analysis, EOQ, reorder level, inventory; motivation theories (Maslow, Herzberg, McGregor); communication and meetings — with worked examples.Read →
- 16Lean ConstructionOrigins of lean thinking in the Toyota Production System; lean principles (value, value stream, flow, pull, perfection); wastes in construction (TIMWOODS); conversion vs flow view of production; Lean Construction Institute and the Last Planner System — master schedule, phase (pull) planning, look-ahead planning, weekly work plans, percent plan complete and reasons for non-completion; takt planning; just-in-time, 5S, kaizen, value stream mapping, visual management, poka-yoke; integrated project delivery and BIM; benefits and barriers — with worked examples.Read →
- 17Land AcquisitionNeed for land acquisition in infrastructure projects; history — Land Acquisition Act, 1894 and its replacement; the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR Act) — public purpose, consent requirements, social impact assessment, procedure (preliminary notification, declaration, award), determination of compensation (market value, multiplier factor, assets, 100% solatium, 12% additional amount), urgency provisions, rehabilitation and resettlement entitlements, safeguards for food security, return of unutilised land, authorities; acquisitions under other Acts (National Highways Act) and alternatives such as negotiated purchase and land pooling — with a worked compensation example.Read →
- 18Repair & Maintenance of BuildingsNeed for maintenance; types — routine, preventive, corrective (breakdown), emergency, planned and condition-based maintenance; annual and special repairs; causes of deterioration of buildings; cracks — structural and non-structural causes (moisture, thermal movement, shrinkage, elastic deformation, creep, settlement, chemical reaction, vegetation, corrosion); diagnosis of distress — visual inspection, crack monitoring, non-destructive and chemical tests; repair materials; repair techniques — crack sealing, epoxy injection, grouting, guniting/shotcrete, stitching, jacketing (RC, steel, FRP), underpinning, corrosion repair and cathodic protection; dampness, leakage and efflorescence remedies; retrofitting and maintenance management.Read →
- 19Project Management Software — MS Project & PrimaveraRole of software in project planning and control; general workflow — calendars, WBS, activities, durations, relationships, constraints, resources, costs, baselines, progress updating and reporting; Microsoft Project — views (Gantt, network diagram, resource sheet, tracking Gantt), task types (fixed units, fixed duration, fixed work), work = duration × units, dependencies and lags, constraints, critical path, resource levelling, baselines; Oracle Primavera P6 — enterprise structure (EPS, OBS), WBS, activity types, duration types, percent complete types, relationships, calendars, scheduling (F9), float, resources and roles, baselines, earned value, XER files; comparison; other tools (BIM 4D/5D, cloud collaboration) — with worked examples.Read →
- 20Green Buildings — GRIHA, IGBC & LEEDConcept and benefits of green buildings; principles — sustainable site, water efficiency, energy efficiency, materials and resources, indoor environmental quality, waste management; passive design strategies; embodied energy and life cycle assessment; green building rating systems — GRIHA (TERI/MNRE), SVAGRIHA, IGBC (CII) and LEED (USGBC) with certification levels, plus BREEAM, Green Star and EDGE; energy codes — ECBC for commercial buildings and Eco Niwas Samhita for residential; net zero buildings; green materials — with worked examples.Read →
Exams that include Construction Planning & Management
Open your exam to see only the chapters its syllabus asks for.
GATE CivilSSC JE CivilUPSC ESE CivilRRB JE Civil CBT-2NTPC NGEL Engineer CivilIOCL Graduate Engineer CivilBOI SO Civil EngineerMbPA AEE & EE CivilBOB SO Civil EngineerCWC AM CivilDSSSB AE CivilDSSSB JE CivilNCRTC Supervisor CivilPSSSB JE CivilJKSSB JE CivilJEPC JE CivilOPSC Assistant Agriculture EngineerCSPC AE CivilCSPC JE CivilTSPSC AE CivilAPPSC AEE CivilTGPSC Manager (Civil)KEA JE CivilTNPSC AE CivilGSSSB Work Assistant CivilRSMSSB JE Civil (Degree)AAI Manager (Civil)APPSC Assistant Environmental EngineerGSPCB Junior Environmental Officer