
BOB SO Civil Engineer Mock Test Series 2026
Bank of Baroda — Specialist Officers, Facility Management: Technical Officer / Manager / Senior Manager (Civil Engineer)
🔄 Updated — 1 question corrected · exam date checked 6 Nov 2026
Also searched as Bank of Baroda Technical Officer Civil mock test
233
Tests Available
3930
Total Questions
2
Free Tests
🏆 Free BOB SO Civil Engineer full mock tests
From CivilGyan Mahamock — the full paper pattern, free for everyone, with solutions.
✅ Start here — these 2 tests are free
No payment · no card · full solutions included
🔓 Unlock all 233 tests in BOB SO Civil Engineer
2 free to try · 231 locked · One payment, valid 1 year · Detailed solutions & analytics
🔥 All-Access opens every series for ₹859 — less than 5 single series (₹945)
2 free · 231 locked · valid 1 year
🗓️ This week's practice · 23 Nov 2026
5 BOB SO Civil Engineer questions for this week
A fresh set every Monday from the exam's own subjects — try each, then open the answer. Next set on 30 Nov 2026.
Q1 · Structural Analysis
A beam member has EI/L = 10000 kN m. If θi = 0.002 rad and θj = -0.001 rad with no joint translations, Mi is:- A.60 kN m
- B.100 kN m
- C.40 kN m
- D.20 kN m
Show answerHide answer
Answer: A
With joint translations restrained, Mi = (4EI/L)θi + (2EI/L)θj. Thus, Mi = 4 x 10000 x 0.002 + 2 x 10000 x (-0.001) = 80 - 20 = 60 kN m.Q2 · Surveying
The geometric error introduced into a raster database due to map translation, rotation, and scaling is corrected by:- A.Radiometric calibration
- B.Histogram stretch
- C.Spatial buffering
- D.Geometric rectification
Show answerHide answer
Answer: D
Geometric rectification establishes ground control points to apply transformations, aligning digital imagery with real-world spatial coordinates.Q3 · RCC Design
According to IS 456:2000 practice, the breadth of the rib (bw) in a T-beam must be chosen such that it provides sufficient space for:- A.Fitting the tension bars with proper spacing
- B.The side-face reinforcement layers
- C.The structural hinges of the slab
- D.The compression bars only
Show answerHide answer
Answer: A
The width of the web bw must be sized practically to comfortably fit the required tension reinforcement layers while satisfying minimum clear spacing constraints between bars for proper concrete consolidation.Q4 · Soil Mechanics & Foundation Engineering
The phenomenon of 'quick sand' is a condition typically observed in:- A.Cohesive soils with high plasticity
- B.Cohesionless soils under downward seepage
- C.Cohesionless soils under upward seepage
- D.Gravelly soils with large voids
Show answerHide answer
Answer: C
Quick sand is a flow condition, not a soil type. It occurs in cohesionless fine sands when upward seepage pressure neutralizes the effective stress (σ' = 0).Q5 · Quantitative Aptitude
A builder borrows Rs. 2550 to be repaid in two equal annual installments under compound interest at 4 percent per annum. Find the value of each installment.- A.Rs. 1326
- B.Rs. 1300
- C.Rs. 1400
- D.Rs. 1352
Show answerHide answer
Answer: D
Concept: The present values of the two installments must add up to the loan. Working: x/1.04 + x/1.04² = 2550; x(0.9615 + 0.9246) = 2550; x = 2550/1.8861 = Rs. 1352. Why not the others: (A) Rs. 1326 — gives a present value of about 2,501, less than 2550. (B) Rs. 1300 — gives a present value of about 2,452, less than 2550. (C) Rs. 1400 — gives a present value of about 2,641, more than 2550. Answer: (D) Rs. 1352.
What is inside the BOB SO Civil Engineer mock test series
9
Full mocks
0
Previous-year papers
207
Chapter tests
17
Subject & sectional
Full-length BOB SO Civil Engineer mocks
- BOB SO Civil Engineer — Full Mock Test 9 — 150 Q · 150 min
- BOB SO Civil Engineer — Full Mock Test 8 — 150 Q · 150 min
- BOB SO Civil Engineer — Full Mock Test 7 — 150 Q · 150 min
- BOB SO Civil Engineer — Full Mock Test 6 — 150 Q · 150 min
- BOB SO Civil Engineer — Full Mock Test 5 — 150 Q · 150 min
- BOB SO Civil Engineer — Full Mock Test 4 — 150 Q · 150 min
- BOB SO Civil Engineer — Full Mock Test 3 — 150 Q · 150 min
- BOB SO Civil Engineer — Full Mock Test 2 — 150 Q · 150 min
- BOB SO Civil Engineer — Full Mock Test 1 — 150 Q · 150 min
BOB SO Civil Engineer subject-wise weightage
How one of our full mocks (150 questions) is made up, subject by subject.
| Subject | Questions in the mock |
|---|---|
| Quantitative Aptitude | 25 |
| General Intelligence & Reasoning | 25 |
| General English | 25 |
| Estimating & Costing | 10 |
| Construction Management | 9 |
| RCC Design | 9 |
| Building Materials | 7 |
| Soil Mechanics & Foundation Engineering | 6 |
| Fluid Mechanics & Hydraulics | 5 |
| Structural Analysis | 5 |
| Environmental Engineering | 5 |
| Strength of Materials | 5 |
| Surveying | 4 |
| Steel Structures | 4 |
Sample BOB SO Civil Engineer questions with solutions
From the free tests in this series — the rest of the series is written the same way.
Estimating & Costing
1. A building has a plinth area of 250 m² and the plinth area rate is ₹ 22,000 per m². The approximate cost, in ₹ lakh, is
- A.11 ₹ lakh
- B.6 ₹ lakh
- C.55 ₹ lakh
- D.550 ₹ lakh
Show answer & solution
Answer: C
With the plinth area rate method, Cost = 250 × 22,000 = ₹ 55,00,000 = ₹ 55 lakh.
Construction Management
2. The standard percentage of contract value usually retained as Security Deposit (including EMD) by public departments in India is:
- A.0.5 percent
- B.5 percent to 10 percent
- C.1 percent to 2 percent
- D.15 percent to 20 percent
Show answer & solution
Answer: B
As per general public works procurement guidelines in India, the total Security Deposit extracted from a contractor ranges from 5 percent to 10 percent of the accepted contract value.
Estimating & Costing
3. In a 'percentage rate' contract, the contractor quotes
- A.separate rates for each item of work
- B.the actual cost plus a fixed fee
- C.a % above or below the estimate or SOR
- D.a single lump sum for the whole work
Show answer & solution
Answer: C
The tendered amount equals the estimate adjusted by the percentage.
BOB SO Civil Engineer test series — FAQs
How many tests are there in the BOB SO Civil Engineer mock test series?
233 tests with 3,930 questions in all: 9 full-length mocks, 207 chapter-wise tests, 17 subject and sectional tests. Every question has a detailed solution.
What does the BOB SO Civil Engineer test series cost?
₹189 for 12 months of the full BOB SO Civil Engineer series. 2 tests are free to attempt without paying. The All-Access Pass (₹859) opens every exam's series for 12 months.
What is a BOB SO Civil Engineer full mock like?
Each full mock follows the exam's pattern — for example "BOB SO Civil Engineer — Full Mock Test 9" has 150 questions in 150 minutes — and shows your score, rank, subject-wise accuracy and the solution to every question when you submit.
Can I try the BOB SO Civil Engineer series before paying?
Yes. These tests are free: Construction Management — Contracts & Legal Aspects - 1; Estimating & Costing — Bill of Quantities & Abstract of Cost - 1. A free account is enough.
BOB SO Civil Engineer exam guide — pattern, syllabus, eligibility, salary →