BOI SO Civil Engineer logo

BOI SO Civil Engineer Mock Test Series 2026

Bank of India — Specialist Officer, Civil Engineer (JMGS-I)

🔄 Updated — new weekly practice set · exam date checked 6 Nov 2026

📖 BOI SO Civil Engineer Guide — Pattern, Syllabus, Cut Off & Salary📅 Make a week-by-week study planPreparing for Bank of Baroda SO (Civil Engineer) instead? →

201

Tests Available

3000

Total Questions

2

Free Tests

🏆 Free BOI SO Civil Engineer full mock tests

From CivilGyan Mahamock — the full paper pattern, free for everyone, with solutions.

🔓 Unlock all 201 tests in BOI SO Civil Engineer

2 free to try · 199 locked · One payment, valid 1 year · Detailed solutions & analytics

🔥 All-Access opens every series for ₹859 — less than 5 single series (₹945)

2 free · 199 locked · valid 1 year

Try free

🗓️ This week's practice · 16 Nov 2026

5 BOI SO Civil Engineer questions for this week

A fresh set every Monday from the exam's own subjects — try each, then open the answer. Next set on 23 Nov 2026.

  1. Q1 · Transportation Engineering

    A concrete pavement slab of length 4.0 m has a uniform coefficient of subgrade friction f = 1.5. Calculate the maximum frictional stress developed at the center if the concrete density is 2400 kg/m³.
    • A.0.036 kg/cm²
    • B.0.72 kg/cm²
    • C.0.288 kg/cm²
    • D.0.144 kg/cm²
    Show answer

    Answer: B

    Frictional stress at the centre Sf = W x L x f/2, with W = 2400 kg/m³ = 0.0024 kg/cm³ and L = 400 cm. Sf = 0.0024 x 400 x 1.5/2 = 0.72 kg/cm².
  2. Q2 · Fluid Mechanics & Hydraulics

    The shape factor (H) of a boundary layer is a key indicator of flow status and is defined as the ratio of:
    • A.Boundary layer thickness to momentum thickness (δ / θ)
    • B.Displacement thickness to momentum thickness (δ× / θ)
    • C.Displacement thickness to energy thickness (δ× / δe)
    • D.Momentum thickness to energy thickness (θ / δe)
    Show answer

    Answer: B

    The shape factor H is defined as H = δ× / θ. A higher shape factor indicates an increased vulnerability of the boundary layer to separation.
  3. Q3 · Soil Mechanics & Foundation Engineering

    A strip footing has c = 20 kN/m², γ = 17 kN/m³, Df = 1 m, B = 2 m, Nc = 17.7, Nq = 7.4 and Nγ = 5. Find qult.
    • A.522.3 kN/m²
    • B.564.8 kN/m²
    • C.607.3 kN/m²
    • D.479.8 kN/m²
    Show answer

    Answer: B

    For a strip footing, qult = cNc + qNq + 0.5gammaBNγ. The surcharge is q = 17 x 1 = 17 kN/m². Thus qult = 20 x 17.7 + 17 x 7.4 + 0.5 x 17 x 2 x 5 = 354 + 125.8 + 85 = 564.8 kN/m².
  4. Q4 · English Language

    Which phrase means 'to do something in the easiest or cheapest way, often reducing quality'?
    • A.cut corners
    • B.keep pace
    • C.hold water
    • D.draw lots
    Show answer

    Answer: A

    The phrase 'cut corners' means to save time or money by doing something carelessly or cheaply.
  5. Q5 · Estimating & Costing

    If the rate of interest on a primary capital investment is 8 percent, what is the value of Year Purchase (YP) for an infinite perpetuity series?
    • A.12.50
    • B.10.00
    • C.8.00
    • D.15.00
    Show answer

    Answer: A

    For an infinite series or perpetuity, Year Purchase simplifies to the reciprocal of the interest rate fraction: YP = 1 / i = 1 / 0.08 = 12.50.

What is inside the BOI SO Civil Engineer mock test series

6

Full mocks

0

Previous-year papers

180

Chapter tests

15

Subject & sectional

Full-length BOI SO Civil Engineer mocks

BOI SO Civil Engineer subject-wise weightage

How one of our full mocks (125 questions) is made up, subject by subject.

SubjectQuestions in the mock
General English25
Construction Management12
Estimating & Costing12
RCC Design10
Soil Mechanics & Foundation Engineering10
Building Materials9
Strength of Materials7
Structural Analysis7
Environmental Engineering6
Steel Structures6
Surveying6
Fluid Mechanics & Hydraulics5
Engineering Mechanics3
Transportation Engineering3

Sample BOI SO Civil Engineer questions with solutions

From the free tests in this series — the rest of the series is written the same way.

  1. English Language

    1. Choose the synonym of 'Prudent'.

    • A.Foolish
    • B.Careless
    • C.Wise
    • D.Reckless
    Show answer & solution

    Answer: C

    'Prudent' means acting with wisdom and good judgment. 'Wise' is its synonym.

  2. Construction Management

    2. A process produces 12 defective units in a sample of 300. What is the percentage defective?

    • A.2%
    • B.3%
    • C.6%
    • D.4%
    Show answer & solution

    Answer: D

    Percentage defective = defective units/total units x 100 = 12/300 x 100 = 0.04 x 100 = 4%.

  3. English Language

    3. Choose the antonym of 'Scarce'.

    • A.Limited
    • B.Abundant
    • C.Insufficient
    • D.Rare
    Show answer & solution

    Answer: B

    'Scarce' means insufficient in quantity, whereas 'Abundant' means available in plenty.

BOI SO Civil Engineer test series — FAQs

How many tests are there in the BOI SO Civil Engineer mock test series?

201 tests with 3,000 questions in all: 6 full-length mocks, 180 chapter-wise tests, 15 subject and sectional tests. Every question has a detailed solution.

What does the BOI SO Civil Engineer test series cost?

₹189 for 12 months of the full BOI SO Civil Engineer series. 2 tests are free to attempt without paying. The All-Access Pass (₹859) opens every exam's series for 12 months.

What is a BOI SO Civil Engineer full mock like?

Each full mock follows the exam's pattern — for example "BOI SO Civil Engineer — Full Mock Test 6" has 125 questions in 100 minutes — and shows your score, rank, subject-wise accuracy and the solution to every question when you submit.

Can I try the BOI SO Civil Engineer series before paying?

Yes. These tests are free: Construction Management — Quality Control & Assurance - 1; English Language — Synonyms & Antonyms - 1. A free account is enough.

BOI SO Civil Engineer exam guide — pattern, syllabus, eligibility, salary →