Chapters

  1. 01Principles & Types of EstimatesPurpose of estimating and data required; approximate (preliminary) estimates — plinth area, cubic content, service unit, typical bay and approximate quantity methods; detailed (item rate) estimates — details of measurements, abstract of cost, contingencies, work-charged establishment and other provisions; revised, supplementary, repair and maintenance, and complete estimates; administrative approval, technical sanction and expenditure sanction; units and rules of measurement (IS 1200) — with solved numericals.Read →
  2. 02Measurement of Works & Measurement BookImportance of measurements; the Measurement Book — purpose, rules for recording, check measurements and legal status; bills — running account, final, first and final, secured advance, hand receipts, muster rolls; standard mode of measurement (IS 1200) — general rules and item-wise rules for earthwork (lead and lift), concrete, formwork, reinforcement, masonry, plastering, flooring, woodwork, painting, steelwork and pipes; recoveries and deductions from bills — with solved numericals.Read →
  3. 03Building Estimates — Long Wall-Short Wall & Centre Line MethodsMethods of estimating walls and foundations — long wall–short wall (out-to-out and in-to-in) method, centre line method (with deductions at junctions) and partly centre-line/partly cross-wall method; sequence of items in a building estimate (excavation, foundation concrete, masonry in foundation and plinth, DPC, superstructure masonry with deductions for openings and lintels, RCC items, formwork and reinforcement, flooring, plastering, doors and windows, finishing, roofing, services); preparation of details of measurement and abstract — with a fully worked single-room building estimate.Read →
  4. 04Earthwork, Road & Canal EstimatesComputation of earthwork — longitudinal and cross sections, depth of cut and fill from formation levels; sectional areas of level sections in embankment and cutting; volume by mid-section (mean depth), mean sectional area (trapezoidal) and prismoidal formulas; mixed sections and transition points; lead and lift; road estimates (earthwork, pavement layers, shoulders, drainage, culverts, road furniture); canal estimates — sections in cutting, filling and partly cutting–partly filling, balancing depth; mass haul — with solved numericals.Read →
  5. 05Bar Bending SchedulePurpose and format of a bar bending schedule (BBS); unit weight of bars; common shapes of bars; hooks, bends and bend deductions (site practice); development length and lap lengths (IS 456); cutting lengths of straight bars, cranked (bent-up) bars, stirrups and ties; number of bars and stirrups; BBS for slabs, beams and columns; wastage and steel quantity — with a worked beam schedule.Read →
  6. 06Analysis of Rates & Schedule of RatesPurpose of rate analysis; factors affecting rates; components — materials (with wastage), labour (task work/output), tools and plant, water charges, overheads and contractor's profit; schedule of rates (CPWD DSR and state SORs) and cost index; material requirements for concrete (dry volume factor), cement mortar and brickwork; labour outputs; step-by-step rate analysis for PCC, brickwork and plastering; market rates, lead and carriage — with solved numericals using explicitly hypothetical rates.Read →
  7. 07SpecificationsMeaning and purpose of specifications; types — general (brief) and detailed specifications, standard, manufacturer's, open and closed (proprietary), performance and prescriptive (method) specifications; principles of writing specifications; sources and standard specifications (CPWD, MoRTH, BIS); detailed specifications of common items — earthwork, PCC, RCC, brick masonry, DPC, plastering, flooring, whitewashing and painting; general specifications of first- to fourth-class buildings; relationship of specifications with drawings and contract documents.Read →
  8. 08Valuation, Depreciation & Rent FixationPurpose of valuation; cost, price and value; types of value — market, book, salvage, scrap, rateable, speculative, distress, monopoly, sentimental and potential value; gross and net income, outgoings; capitalised value and years' purchase; sinking fund and depreciation — straight line, constant percentage (declining balance), sinking fund and quantity survey methods; obsolescence; methods of valuation — rental, direct comparison, land and building (cost) method, profit, development and belting methods; lease, mortgage, easements; free-hold and lease-hold property — with solved numericals.Read →
  9. 09Bill of Quantities, Abstract of Cost & Schedules of RatesWhat a Bill of Quantities (BOQ) is and how it is prepared from measured quantities; the abstract of estimated cost with contingencies, work-charged establishment and other percentage charges; the schedules of rates (CPWD DSR, state SSR/SOR) with cost-index and area-weightage adjustments; and a worked example of a BOQ and an abstract of cost with explicitly hypothetical rates.Read →
  10. 10Tenders, Tender Documents & Variation StatementsThe tendering process (NIT, e-tendering, pre-qualification, bid security or EMD, technical and financial evaluation, L1, award), contents of a tender document, types of contract (item rate, lump sum, percentage rate, EPC, cost-plus), performance security, payment (running account bills, retention), variations and extra items, deviation statements and revised estimates, escalation, and worked numerical examples.Read →