Stone Masonry

Technical terms in masonry (course, bed, joints, header, stretcher, through stone, quoin, corbel, cornice, coping, string course, jamb, reveal, sill, lintel, hearting, weathering, throating); classification of stone masonry — rubble masonry (random rubble, squared rubble, polygonal, flint, dry rubble) and ashlar masonry (fine, rough tooled, quarry faced, chamfered, block-in-course); general principles of construction; tools; joints in stonework; composite masonry; comparison of stone and brick masonry; quantity estimation — with solved numericals.

📑 Contents (10 sections)

Last reviewed 16 Sept 2026 · 10 min read

Masonry

Masonry is construction with individual units (stones, bricks, blocks) laid and bound together with mortar. Stone masonry is used for foundations, walls, retaining walls, piers, abutments, dams and architectural facings where good stone is locally available.

Technical terms

Term Meaning
Course A horizontal layer of stones or bricks
Bed The surface of a stone perpendicular to the line of pressure (its top/bottom in a wall); bed joint — horizontal mortar joint
Joint (cross/vertical joint, perpend) Mortar joint perpendicular to the bed joints
Header A stone (or brick) laid with its length across the wall (perpendicular to the face)
Stretcher A stone laid with its length along the face of the wall
Through stone (bond stone) A stone extending through the full thickness of the wall — ties both faces together
Quoins Stones forming the external corners of walls, usually larger and dressed
Corbel A stone projecting from the wall face to support a beam, cornice or other load
Cornice A projecting ornamental course at the top of a wall (also sheds rainwater)
Coping Covering course on the top of a wall/parapet to protect it from rain; weathered (sloped) and throated
String course Horizontal course projecting from the wall face along its length (at floor or sill level) — appearance and weather protection
Plinth course The top course of the plinth
Jambs Vertical sides of a door or window opening
Reveal The exposed part of the jamb between the frame and the wall face
Sill Horizontal member at the bottom of a window opening (weathered to shed water)
Lintel Horizontal member spanning over an opening
Hearting The interior filling of a wall between the face and back stones
Spalls (pinnings) Small chips of stone used to fill interstices in rubble masonry
Weathering Sloping top surface of projecting courses to shed rainwater
Throating A groove on the underside of a projecting course or sill so that water drips off and does not run back to the wall
Blocking course Course placed above a cornice to weigh it down
Parapet Low wall at the edge of a roof, terrace or bridge
Template A stone/concrete block placed under a beam to distribute load on the wall
Arris The sharp edge where two surfaces of a stone meet

Classification of stone masonry

1. Rubble masonry

Stones of irregular sizes and shapes (as obtained from the quarry or roughly dressed) laid in mortar. Economical but lower strength than ashlar.

Type Description Use
Uncoursed random rubble Stones of irregular shape and size laid without regular courses; interstices filled with spalls and mortar; larger stones at corners and jambs; through stones at intervals Walls of low-height buildings, compound walls, godowns, foundations
Coursed random rubble Stones of irregular shapes brought to level courses at intervals (e.g. every 30–45 cm) Residential buildings, public works — better than uncoursed
Uncoursed squared rubble Stones roughly squared (hammer dressed) laid without courses Ordinary buildings
Coursed squared rubble Squared stones in courses of varying height Better class walls
Regular coursed rubble Squared stones with uniform course heights Public buildings, residential buildings, piers and abutments of ordinary bridges
Polygonal rubble Stones hammer dressed to polygonal (irregular polygon) faces fitting together Decorative walls
Flint rubble Flints (nodules of silica) as facing, with lacing courses of brick or stone Regions where flint is available
Dry rubble masonry Rubble laid without mortar, carefully packed with spalls Retaining walls on hill roads, pitching, compound walls, revetments (allows drainage)

2. Ashlar masonry

Stones finely dressed to regular shapes and sizes, laid in courses with fine, thin joints (often about 3–6 mm). Strong, attractive, but costly.

Type Face finish
Ashlar fine Every stone finely dressed on all sides; very thin joints — superior facing, monuments, important buildings
Ashlar rough tooled Bed and side joints finely dressed; exposed face rough tooled (with a margin chisel-drafted)
Ashlar rock (quarry) faced Exposed face left rough as from the quarry, with chisel-drafted margins — rustic appearance, massive look
Ashlar chamfered Edges of the exposed face chamfered (bevelled) to form grooves at joints — used for plinths, quoins
Ashlar facing Ashlar stones used as facing with rubble or brick backing
Block-in-course Intermediate between rubble and ashlar — stones squared and dressed, courses of uniform height (often 20–30 cm), joints thicker than in ashlar — heavy works (bridges, docks, retaining walls)

3. Composite masonry

A combination of different masonry types or materials — e.g. stone facing with brick backing, stone and concrete — for economy and appearance while using cheaper backing.

General principles of construction

  1. Use hard, durable, well-seasoned stones free from defects; wet stones before laying to avoid absorbing water from mortar.
  2. Lay stones on their natural bed (bed perpendicular to the pressure); in arches the bed is radial; in cornices vertical.
  3. Provide through (bond) stones at regular intervals (commonly about 1.5–2 m apart in each course and at every course or alternate courses in height) or headers overlapping from both faces where full-length stones are not available.
  4. Break (stagger) vertical joints in successive courses — avoid continuous vertical joints.
  5. Face stones should tail well into the wall (length into the wall at least equal to height); hearting solidly filled with stones, spalls and mortar — no hollow spaces.
  6. Use the largest stones in the lower courses, at corners (quoins) and jambs.
  7. Use mortar of suitable proportion (commonly cement mortar 1 : 6 for rubble work); joints fully filled.
  8. Raise walls uniformly throughout their length — limit the height raised in a day; stagger (rack back) junctions for later work.
  9. Keep walls plumb and courses level; check with plumb bob and spirit level.
  10. Cure masonry by keeping it wet (commonly at least 7 days for cement mortar).
  11. Protect fresh work from rain, frost and hot sun.
  12. Provide weathering and throating on projecting courses; coping on parapets.

Tools used in stone masonry

Trowel, spirit level, plumb bob and plumb rule, straight edge, square, mason's line, mallet and hammers (spalling hammer, club hammer), chisels (pitching tool, punch, point, claw tool, drafting chisel, boaster), scutch, gauges and templates.

Quick check · 5 questions · 3 minutes

Padh liya? Ab dekho kitna yaad raha.

Five exam-level questions from Building Materials & Construction. No timer, no payment.

Joints in stonework

Joint Description / use
Butt (square) joint Plain joint — ordinary work
Rebated (lapped) joint Stones with rebates overlapping — copings, gable walls
Tongue and groove (joggle) joint Tongue fits into groove — prevents sliding (steps, copings, lintels)
Cramped joint Metal cramps (copper, gunmetal, stainless steel) set in mortises across joints — copings, cornices, parapets
Dowelled joint Dowels (metal/slate) fitted into holes in adjacent stones — prevents sliding
Plugged joint Dovetail recesses filled with molten lead/mortar
Joggled joint Projection fits into recess — arches, flat arches, heavy stonework

Stone masonry compared with brick masonry

Stone masonry Brick masonry
Higher strength and durability; resists weathering Adequate strength; less durable in severe exposure
Heavier; thicker walls needed (commonly at least about 350–400 mm) Thinner walls possible (half-brick, one-brick)
Greater skill and time for dressing and laying Easier and faster; uniform units
Economical only where stone is locally available Generally economical and widely available
Better appearance (natural stone), less maintenance Needs plaster/pointing for weather protection in many cases
Poor thermal insulation (dense stone); damp penetration possible through joints Better thermal insulation than dense stone
Difficult to make openings, alterations Easier alterations and fixing
Suitable for dams, retaining walls, piers, foundations, monumental buildings Suitable for most building walls

Quantity estimation

Stone masonry is measured in cubic metres (m³). For rubble masonry, quantities of stone and mortar per m³ of masonry are taken from standard data of the relevant schedule of rates — for rough estimates, rubble masonry is often assumed to need about 0.3–0.35 m³ of wet mortar per m³ of masonry, with the remainder stone (allowing for voids in stacked stone).

Worked examples

Worked ExampleExample 1 — wall volume

A random rubble masonry wall is 10 m long, 3 m high and 450 mm thick. Find its volume.

Solution.

Worked ExampleExample 2 — mortar materials

For the wall in Example 1, assuming 0.34 m³ of wet cement mortar (1 : 6) per m³ of masonry and a dry volume factor of 1.30, find the cement (bags) and sand required.

Solution. Wet mortar m³ → dry volume m³ Cement m³ → Sand

Worked ExampleExample 3 — through stones

A 12 m long coursed rubble wall has through stones at 1.5 m centres in every course. How many through stones per course are needed?

Solution. spaces → about 8–9 through stones per course (including one near each end/corner)

Frequently tested points

  • Header — length across wall; stretcher — length along face; through (bond) stone — full thickness.
  • Quoins at corners; corbel projects to support loads; coping on top of walls; throating drips water off.
  • Hearting fills the interior; spalls fill gaps in rubble.
  • Rubble masonry: uncoursed random, coursed random, squared rubble (uncoursed/coursed/regular coursed), polygonal, flint, dry rubble (retaining walls on hill roads).
  • Ashlar masonry: finely dressed stones, thin joints — ashlar fine, rough tooled, rock/quarry faced, chamfered; block-in-course intermediate.
  • Principles: natural bed, through stones at intervals, staggered joints, solid hearting, largest stones at bottom and corners, uniform raising, curing.
  • Joints: rebated, tongue and groove, cramped (metal cramps), dowelled, joggled.
  • Stone masonry — stronger, more durable, heavier, thicker walls, more skill; brick masonry — faster, thinner walls, easier alterations.
Common MistakeCommon mistakes
  • Leaving continuous vertical joints or hollow hearting in rubble walls.
  • Omitting through stones in thick walls, causing the two faces to separate.
  • Laying stratified stones with the natural bed parallel to the load direction.
Revision SummaryChapter summary
  1. Masonry terms describe units, joints, courses and architectural elements such as quoins, corbels, cornices, copings, sills and lintels.
  2. Rubble masonry (random, squared, polygonal, flint, dry) is economical; ashlar masonry with finely dressed stones is strong and attractive; block-in-course lies between.
  3. Good construction lays stones on the natural bed, uses through stones, staggers joints, fills hearting solidly and cures the work.
  4. Special joints (rebated, tongue and groove, cramped, dowelled, joggled) resist sliding and separation.
  5. Stone masonry is stronger and more durable but heavier and slower than brick masonry; quantities are measured in cubic metres with mortar estimated from standard data.

Practise this chapter for your exam

This chapter is in the syllabus of 27 exams. Take its chapter test, then the full mock tests of your exam.

🎯 Finished reading? Test yourself

Masonry and Plaster Work — free chapter test

Exam-style questions from the syllabus chapter “Masonry and Plaster Work”, with solutions after you submit. Free — you can start without an account.

Take the free test →

✅ Free — no sign-up needed

How ready are you for Building Materials & Construction?

Ten questions from the real syllabus, about five minutes. You will see your score and which subject is holding you back — before you create any account.

10 questions · no timer · no payment