RITES Manager & AM Civil logo

RITES Manager & AM Civil Mock Test Series 2026

RITES Ltd (Ministry of Railways) — Manager & Assistant Manager, Civil: Bridges, Metro, Survey, Tunnel

🔄 Updated — new weekly practice set · exam date checked 6 Nov 2026

📖 RITES Manager & AM Civil Guide — Pattern, Syllabus, Cut Off & SalaryDiploma holder? RITES Senior Technical Assistant (Civil) series →

336

Tests Available

6260

Total Questions

2

Free Tests

🏆 Free RITES Manager & AM Civil full mock tests

From CivilGyan Mahamock — the full paper pattern, free for everyone, with solutions.

🔓 Unlock all 336 tests in RITES Manager & AM Civil

2 free to try · 334 locked · One payment, valid 1 year · Detailed solutions & analytics

🔥 All-Access opens every series for ₹859 — less than 5 single series (₹945)

2 free · 334 locked · valid 1 year

Try free

🗓️ This week's practice · 16 Nov 2026

5 RITES Manager & AM Civil questions for this week

A fresh set every Monday from the exam's own subjects — try each, then open the answer. Next set on 23 Nov 2026.

  1. Q1 · Surveying

    Which of these is NOT a method for calculating the volume of earthwork?
    • A.Mean sectional area
    • B.Prismoidal formula
    • C.Trapezoidal formula
    • D.Rise and fall method
    Show answer

    Answer: D

    Mean sectional area, the trapezoidal (end-area) formula and the prismoidal formula are all used to compute earthwork volumes from cross-sections. The rise and fall method is a way of reducing levels in levelling, not a volume method.
  2. Q2 · Soil Mechanics & Foundation Engineering

    For a soil with porosity n, degree of saturation S and air content ac, the sum (n × S) + na, where na is the percentage air voids, is equal to:
    • A.1
    • B.1 - ac
    • C.ac
    • D.n
    Show answer

    Answer: D

    Porosity n = Vv/V = Vw/V + Va/V. Here Vw/V = nS and Va/V = na, so nS + na = n.
  3. Q3 · Prestressed Concrete Design

    A prestressed rectangular section has a tendon area of 1000 mm² with a design stress at failure fpd = 1400 N/mm², and b = 300 mm, fck = 40 N/mm². The depth of the compression block xu = Aps fpd/(0.36 fck b), in mm, is
    • A.97.2 mm
    • B.324.1 mm
    • C.162.0 mm
    • D.648.1 mm
    Show answer

    Answer: B

    T = 1000 × 1400 = 1,400,000 N. xu = 1,400,000/(0.36 × 40 × 300) = 324.1 mm.
  4. Q4 · Steel Structures

    For structural steel grade Fe410, what are the specified minimum yield stress (fy) and ultimate tensile strength (fu) for a product thickness less than 20 mm?
    • A.fy = 250 MPa, fu = 410 MPa
    • B.fy = 250 MPa, fu = 540 MPa
    • C.fy = 240 MPa, fu = 410 MPa
    • D.fy = 300 MPa, fu = 410 MPa
    Show answer

    Answer: A

    According to Table 1 of IS 800:2007, for Fe410 steel with thickness less than 20 mm, the minimum yield strength fy is 250 N/mm² (MPa) and the ultimate tensile strength fu is 410 N/mm² (MPa).
  5. Q5 · Structural Analysis

    According to Castigliano's second theorem, the partial derivative of the total strain energy of a truss with respect to an internal member force redundant R is equal to:
    • A.The external load magnitude
    • B.Its lack of fit (relative displacement)
    • C.The global factor of safety
    • D.The total volume of the truss
    Show answer

    Answer: B

    Castigliano's Second Theorem states that dU/dR = δ. If the redundant member has no initial lack-of-fit and supports are unyielding, the relative displacement δ is zero, leading to the least work equation dU/dR = 0.

What is inside the RITES Manager & AM Civil mock test series

20

Full mocks

0

Previous-year papers

286

Chapter tests

30

Subject & sectional

Full-length RITES Manager & AM Civil mocks

RITES Manager & AM Civil subject-wise weightage

How one of our full mocks (125 questions) is made up, subject by subject.

SubjectQuestions in the mock
Bridge Engineering18
RCC Design13
Estimating & Costing11
Soil Mechanics & Foundation Engineering10
Surveying9
Structural Analysis7
Railway Track & Alignment Engineering6
Transportation Engineering6
Prestressed Concrete Design6
Steel Structures5
Steel Structures5
Bridge Instrumentation & Monitoring4
Finite Element Method & Structural Modelling4
Structural Analysis4

Sample RITES Manager & AM Civil questions with solutions

From the free tests in this series — the rest of the series is written the same way.

  1. Bridge Engineering

    1. The IRC live load on footpaths of a bridge is normally taken as

    • A.4.0 kN/m²
    • B.0.5 kN/m²
    • C.10 kN/m²
    • D.1.0 kN/m²
    Show answer & solution

    Answer: A

    IRC:6 prescribes 400 kg/m² for footpaths, reduced for larger loaded lengths. It is not applied together with the full vehicle loading in the same way on the carriageway.

  2. Railway Track & Alignment Engineering

    2. Super-elevation (cant) on a railway curve is provided by

    • A.raising the outer rail
    • B.widening the gauge
    • C.lowering both rails
    • D.raising the inner rail
    Show answer & solution

    Answer: A

    The outer rail is raised and the inner rail is kept at the design level, so that the track is inclined towards the centre of the curve.

  3. Bridge Engineering

    3. Which of the following are the standard live load classes specified by IRC:6 for road bridges?

    • A.Class H, HS and Class I only
    • B.Class 25, Class 32 and Class 40
    • C.MBG, HM and DFC loading
    • D.Class AA, Class 70R, Class A and Class B
    Show answer & solution

    Answer: D

    IRC:6 specifies IRC Class AA and Class 70R as heavy loadings for the main highways, Class A for general use and Class B for temporary or less important bridges.

RITES Manager & AM Civil test series — FAQs

How many tests are there in the RITES Manager & AM Civil mock test series?

336 tests with 6,260 questions in all: 20 full-length mocks, 286 chapter-wise tests, 30 subject and sectional tests. Every question has a detailed solution.

What does the RITES Manager & AM Civil test series cost?

₹189 for 12 months of the full RITES Manager & AM Civil series. 2 tests are free to attempt without paying. The All-Access Pass (₹859) opens every exam's series for 12 months.

What is a RITES Manager & AM Civil full mock like?

Each full mock follows the exam's pattern — for example "RITES Manager & AM Civil — Full Mock Test 20" has 125 questions in 150 minutes — and shows your score, rank, subject-wise accuracy and the solution to every question when you submit.

Can I try the RITES Manager & AM Civil series before paying?

Yes. These tests are free: Railway Track & Alignment Engineering — Curves, Super-elevation & Cant Deficiency - 1; Bridge Engineering — Loads on Bridges (IRC & IRS Loading) - 1. A free account is enough.

RITES Manager & AM Civil exam guide — pattern, syllabus, eligibility, salary →