1. Environmental Management Plan (EMP)
The EMP is the part of an EIA report that says how the predicted impacts will be avoided, reduced or compensated, and who will do it and at what cost.
| Component | Contents |
|---|---|
| Mitigation measures | Component-wise: air (ESP, bag filters, scrubbers, stack height), water (ETP, STP, zero liquid discharge, rainwater harvesting), noise (enclosures, barriers), land (topsoil conservation, reclamation), biological (green belt, wildlife plan), socio-economic (R&R, CSR) |
| Environmental monitoring programme | Parameters, locations, frequency and methods for air, water, noise, soil and ecology — during construction and operation |
| Institutional set-up | An environment management cell, responsibilities, reporting to the regulator (half-yearly compliance reports) |
| Budget | Capital and recurring costs of environmental protection |
| Green belt | Typically about one-third of the project area for many industries, with native species |
| Occupational health and safety | Health surveillance of workers |
| Emergency and disaster management plan | For hazardous industries — on-site and off-site plans |
| Post-project monitoring and audit | To check compliance with environmental clearance conditions |
EIA predicts impacts; the EMP manages them. An EIA without a credible EMP is of little use.